An innovative development company with its own team of engineers and technicians, Biogáz Unió can take part in the full course of the project, including the building permit authorization, the construction process and the following occupancy authorization as well as maintenance and biological supervision, paying close attention to the special requirements of the client all the way.
Our activities are:
- Planning-Building permit authorization
- Construction
- Maintenance
- Facility management
- Facilty management consultancy
- Increasing efficiency
The advantages of the technological solution offered by Biogáz Unió Zrt. are:
- The selection of the technological solutions and components most appropriate for the input materials to be used, independent of the manufacturer of the components
- The use of high-standard products of renowned German manufacturers (Wangen, Fliegl, KSB, etc.)
- The selection of higher quality components with longer service life from the available range
- More Hungarian added value, the production of certain technological units in Hungary, based on our own designs
![]() | ![]() |
|||
Year of construction: Location: Electric output: Heat output: Input materials: | 2009 Kaposszekcső 836 kW 924 kW solid manure, silage | Year of construction: Location: Electric output: Heat output: Input materials: | 2010 Bugyi 499 kW 516 kW solid manure, silage |
|
![]() | ![]() |
|||
Year of construction: Location: Electric output: Heat output: Input materials: | 2011 Bicsérd 637 kW 631 kW slurry, solid manure | Year of construction: Location: Electric output: Heat output: Input materials: | 2011 Tiszaszentimre 637 kW 631 kW slurry, solid manure, meat pulp, silage |
|
![]() | ![]() |
|||
Year of construction: Location: Electric output: Heat output: Input materials: | 2011 Kisbér 844 kW 843 kW slurry, solid manure, silage | Year of construction: Location: Electric output: Heat output: Input materials: | 2012 Csongrád 637 kW 631 kW slurry, solid manure, silage |
|
![]() | ![]() |
|||
Year of construction: Location: Electric output: Heat output: Input materials: | 2013 Tatabánya 2078 kW 2053 kW solid manure, silage, sewage sludge, by-products | Year of construction: Location: Electric output: Heat output: Input materials: | 2014 Békés 1189 kW 1160 kW slurry manure, silage |